Update on Greenhouse.

  • Up date. Now the base is finished we have started on the construction of the GH. Son put the frame base together and we have put my potting ben inside that as once the GH is up we won't be able to get it in. My son said the frame will be completed tomorrow and on Monday he will put the glass in, that should be fun just pray it's not windy when the glass goes in.





  • When the GH is up I then have to bring the path up level with the concrete base as there's a four inch difference in height. I have some slabs to go in the front which will bring the level up where the GH door will be.

    Before we can put the GH together we have to cut back more tree's, Ivy, Passion flower, Russian Vine, all coming over from the people at the back of us.